Home
Up

 

 

 

News Item 3

Completed Contract
Acorn Children's Hospice - Worcester

A Double whammy for Woodroyd. 300m² of Safety Surfacing and 440m² of Bound Aggregate Surfacing to Garden Paths.

7 April 2005


Part of the 300m² of Rubber Crumb Safety Surfacing.

Partly because Woodroyd was able to offer both Bound Aggregate AND Rubber Crumb Safety Surfacing, the company was chosen to undertake this prestigious contract in Worcester.

One section of Safety Surfacing was intended to represent a beach and sea whilst another section emulated the sun, moon and stars.

Woodroyd use a revolutionary technique of lightly pre-coating the rubber crumb with a special adhesive resin that enhances the bond of the main adhesive thus creating a stronger surface at lower cost.

                   

 


Part of the 440m² of Bound Aggregate Paths.

In order to provide a child and wheelchair friendly surface Woodroyd's Bound Aggregate was chosen. Bound aggregate is produced by binding aggregate with a special non yellowing adhesive. Installed at about 30mm thick, the path is durable and attractive.

         
Path detail showing Golden Pea Gravel and Joint.         Aggregate Detail

 

Copyright © 2005 Woodroyd Limited
Last modified: 04/18/05